Rlr 01 status
rlr_01_status
Packet completeness status code
Scores if within ±0% of the reference value.
Review-native long-horizon task over a generated SSC-02 level-crossing issue packet. The agent receives a multi-file source packet in /workspace/sources/ covering route profile, sighting and warning time, crossing controls, backup power, communications, degraded-mode operations, criteria, and review comments. The task is to inventory the packet, preserve route/crossing identity, recompute source-owned evidence, assign one status per review item, raise findings/information requests/actions, and issue a readiness decision. Packet variants inject missing battery evidence, stale warning-time revisions, sighting chainage mismatches, copied degraded-mode scenarios, open comments, carried actions, or genuine warning-time failures. Scored by a stage-gated custom verifier.
no-tool: The model must reason numerically unaided.
One template produces many comparable benchmark tasks while keeping the scoring contract fixed.
01
The reusable contract shown on this page.
02
An archetype and site context are sampled.
03
Inputs may be hidden at harder tiers.
04
The model responds with the declared outputs.
Inputs the model receives, and the outputs it is scored on.
38 inputs
Included directly in every task prompt.
Maximum train speed kmh
maximum_train_speed_kmh
Maximum train speed for the controlling crossing approach
Minimum warning time
minimum_warning_time_s
Minimum warning time criterion for the crossing approach
Gate lowering time
gate_lowering_time_s
Gate lowering duration from the crossing controller sheet
Gate start delay
gate_start_delay_s
Delay from warning start to gate descent
Required gate horizontal before arrival
required_gate_horizontal_before_arrival_s
Required time with gates horizontal before train arrival
Controller load
controller_load_w
Crossing controller load
Flashing light load
flashing_light_load_w
Load per flashing-light assembly
Flashing light count
flashing_light_count
Flashing-light assembly count
Gate mechanism load
gate_mechanism_load_w
Load per gate mechanism
Gate mechanism count
gate_mechanism_count
Gate mechanism count
Comms switch load
comms_switch_load_w
Communications switch load
Track circuit load
track_circuit_load_w
Track circuit and detector load
Event recorder load
event_recorder_load_w
Event recorder load
Load future allowance pct
load_future_allowance_pct
Spare and future allowance for crossing signal load
Required autonomy
required_autonomy_h
Required degraded-mode backup autonomy
Dc system voltage
dc_system_voltage_v
DC system voltage
Depth of discharge pct
depth_of_discharge_pct
Usable battery depth of discharge
Temperature derating factor
temperature_derating_factor
Battery temperature derating factor
Inverter efficiency pct
inverter_efficiency_pct
UPS inverter efficiency
Load power factor
load_power_factor
UPS load power factor
Feeder resistance milliohm per m
feeder_resistance_milliohm_per_m
Conductor resistance
Max voltage drop percent
max_voltage_drop_percent
Maximum DC feeder voltage drop
Fiber length
fiber_length_km
Fiber link length
Fiber attenuation db per km
fiber_attenuation_db_per_km
Fiber attenuation
Fiber connector count
fiber_connector_count
Fiber connector count
Connector loss
connector_loss_db
Loss per fiber connector
Fiber splice count
fiber_splice_count
Fiber splice count
Splice loss
splice_loss_db
Loss per fiber splice
Patch panel allowance
patch_panel_allowance_db
Patch-panel allowance
Optical tx power
optical_tx_power_dbm
Optical transmitter power
Receiver sensitivity
receiver_sensitivity_dbm
Receiver sensitivity
Required fiber margin
required_fiber_margin_db
Required excess fiber margin
Visible in easier tasks and withheld in one or more harder tiers.
Warning time margin
warning_time_margin_s
Derivation margin between provided and minimum warning time
Hidden at easy and medium and hard difficulty.
Warning time deficit
warning_time_deficit_s
Derivation deficit for the warning-time-deficient variant
Hidden at easy and medium and hard difficulty.
Battery runtime margin
battery_runtime_margin_h
Derivation margin between required autonomy and installed battery runtime
Hidden at easy and medium and hard difficulty.
Selected ups rating margin
selected_ups_rating_margin_va
Derivation margin between required and selected UPS rating
Hidden at easy and medium and hard difficulty.
Voltage drop margin target percent
voltage_drop_margin_target_percent
Derivation margin between feeder voltage drop and the source-owned maximum
Hidden at easy and medium and hard difficulty.
Packet variant
packet_variant
Hidden packet-defect variant controlling gold review statuses
Hidden at easy and medium and hard difficulty.
25 outputs
rlr_01_status
Packet completeness status code
Scores if within ±0% of the reference value.
rlr_02_status
Object identity status code
Scores if within ±0% of the reference value.
rlr_03_status
Warning-time basis status code
Scores if within ±0% of the reference value.
rlr_04_status
Crossing warning and backup adequacy status code
Scores if within ±0% of the reference value.
rlr_05_status
Degraded-mode scenario status code
Scores if within ±0% of the reference value.
rlr_06_status
Feeder and fiber resilience status code
Scores if within ±0% of the reference value.
rlr_07_status
Comment and action closure status code
Scores if within ±0% of the reference value.
rlr_08_status
Readiness consistency status code
Scores if within ±0% of the reference value.
rlr_09_status
Claim boundary status code
Scores if within ±0% of the reference value.
readiness_code
Gold readiness decision
Scores if within ±0% of the reference value.
required_findings_count
Findings the review must raise
Scores if within ±0% of the reference value.
required_information_requests_count
Information requests the review must raise
Scores if within ±0% of the reference value.
required_carried_actions_count
Carried actions the review must record
Scores if within ±0% of the reference value.
maximum_train_speed_m_s
Approach train speed evidence
Scores if within ±2% of the reference value.
provided_warning_time_s
Provided warning time from strike-in distance
Scores if within ±2% of the reference value.
strike_in_distance_m
Strike-in distance evidence
Scores if within ±2% of the reference value.
warning_time_margin_s
Warning-time margin evidence
Scores if within ±2% of the reference value.
gate_horizontal_margin_s
Gates-horizontal timing margin evidence
Scores if within ±2% of the reference value.
design_signal_load_w
Design signal load evidence
Scores if within ±2% of the reference value.
required_battery_capacity_ah
Required battery capacity evidence
Scores if within ±2% of the reference value.
installed_battery_capacity_ah
Installed battery capacity evidence
Scores if within ±2% of the reference value.
battery_runtime_h
Battery runtime evidence
Scores if within ±2% of the reference value.
battery_runtime_margin_h
Battery runtime margin evidence
Scores if within ±2% of the reference value.
dc_voltage_drop_margin_percent
DC voltage-drop margin evidence
Scores if within ±2% of the reference value.
fiber_link_margin_db
Fiber link margin evidence
Scores if within ±2% of the reference value.
Each template is sampled at three tiers. Harder tiers may hide inputs, forcing the model to infer them from the scenario description.
Some inputs hidden
Obvious packet defects: clean, missing backup evidence, or genuine warning-time failure
Hidden inputs
Packet variant restricted to: clean, missing_battery_capacity, warning_time_deficient
Some inputs hidden
Full packet-variant distribution
Hidden inputs
Some inputs hidden
Subtle documentary defects: stale warning basis, sighting identity drift, scenario copy-forward, carried comments
Hidden inputs
Packet variant restricted to: stale_warning_revision, chainage_sighting_mismatch, scenario_copy_forward, minor_open_comment_carried
The exact instruction and parameter contract used to generate this task, pinned to the published library source.
/workspace
Teal lines show Jinja input conditions, not task visibility policy. A line renders only when that input or tool is visible.
1You are the independent reviewing engineer for a level-crossing warning, controls, backup-power, and communications issue package.2 3A source packet has been placed in `/workspace/sources/`. It contains a document register, route profile, sighting and warning-time worksheet, crossing control layout, backup-power and communications schedule, degraded-mode operations note, and criteria/comments memo. The packet is a task-owned synthetic source pack; treat it as the only source of truth for this review.4 5Your job is not to redesign the crossing. Your job is to decide whether the package is ready to issue, and to produce an auditable review record.6 7## Review Workflow8 91. Inventory the source packet before drawing any conclusion.102. Build an identity ledger for the route profile, crossing ID, sighting worksheet, control layout, backup schedule, communications link, degraded-mode scenario, and criteria memo.113. Check for source conflicts, stale revisions, copied scenarios, missing evidence, crossing identity drift, and open critical comments before accepting package claims.124. Recompute only the evidence needed for review items, using the assessment bases stated in the criteria memo.135. Assign exactly one status to every review item: `pass`, `fail`, `not_applicable`, or `insufficient_data`.146. Do not invent missing values. Mark missing evidence as `insufficient_data` and request the exact missing field and source.157. Convert every failure into a finding with a source pointer, affected object, consequence, and corrective action.168. Issue a readiness decision that reconciles with your matrix, findings, information requests, and action register.17 18## Review Matrix19 20| Item | Review question |21|---|---|22| RLR-01 | Packet completeness: are the required route, sighting, control, backup, communications, degraded-mode, criteria, and comment sources present with IDs and revisions? |23| RLR-02 | Object identity: do the route profile, sighting worksheet, control layout, backup schedule, communications link, and degraded-mode note refer to the same crossing and approach? |24| RLR-03 | Warning-time basis: are speed, strike-in distance, warning-time, gate timing, backup-power, feeder, and fiber bases traceable, current, and recomputable? |25| RLR-04 | Crossing warning and backup adequacy: do warning time, gate-horizontal timing, and backup runtime clear the source-owned criteria? |26| RLR-05 | Degraded-mode scenario: is the same degraded operating case used across warning, backup, feeder, fiber, and operator sources? |27| RLR-06 | Feeder and communications resilience: are voltage-drop and fiber-link margins source-backed and internally consistent with the selected load? |28| RLR-07 | Comment and action closure: is every critical comment closed, and are carried minor comments owner/action controlled? |29| RLR-08 | Readiness consistency: does your final decision match your own matrix, findings, information requests, and action register? |30| RLR-09 | Claim boundary: does your review avoid unsupported approval, compliance, source-hardening, executable-verifier, or benchmark-readiness claims? |31 32## Boundary Rules33 34- Use the review matrix definitions to decide the most specific affected item from the source packet.35- If a source value needed for recomputation is absent, omit the dependent `computed_evidence` key and raise an information request for the missing field and source.36- Assign additional failures only when the source packet gives independent evidence for them; do not double-count one source issue across unrelated matrix rows.37- RLR-08 passes when the readiness decision reconciles with the review matrix, findings, information requests, and action register.38- Every finding, information request, and action must name one exact RLR item.39- Do not rename computed_evidence keys.40 41## Output42 43Write your complete review to `/workspace/output.md`. Explain your reasoning briefly in prose, then end with exactly one fenced JSON block:44 45```json46{47 "source_inventory": [{"doc_id": "...", "revision": "...", "status": "..."}],48 "identity_ledger": {49 "route_profile": "...",50 "sighting_warning_time": "...",51 "crossing_layout": "...",52 "backup_power_comms": "...",53 "degraded_mode": "...",54 "criteria_comments": "...",55 "crossing_id": "..."56 },57 "review_matrix": {58 "RLR-01": {"status": "pass|fail|not_applicable|insufficient_data", "evidence": "..."},59 "RLR-02": {"status": "...", "evidence": "..."},60 "RLR-03": {"status": "...", "evidence": "..."},61 "RLR-04": {"status": "...", "evidence": "..."},62 "RLR-05": {"status": "...", "evidence": "..."},63 "RLR-06": {"status": "...", "evidence": "..."},64 "RLR-07": {"status": "...", "evidence": "..."},65 "RLR-08": {"status": "...", "evidence": "..."},66 "RLR-09": {"status": "...", "evidence": "..."}67 },68 "computed_evidence": {69 "maximum_train_speed_m_s": 0,70 "provided_warning_time_s": 0,71 "strike_in_distance_m": 0,72 "warning_time_margin_s": 0,73 "gate_horizontal_margin_s": 0,74 "design_signal_load_w": 0,75 "required_battery_capacity_ah": 0,76 "installed_battery_capacity_ah": 0,77 "battery_runtime_h": 0,78 "battery_runtime_margin_h": 0,79 "dc_voltage_drop_margin_percent": 0,80 "fiber_link_margin_db": 081 },82 "findings": [83 {"item": "RLR-0X", "severity": "critical|minor", "source_id": "...", "object_id": "...", "consequence": "...", "action": "..."}84 ],85 "information_requests": [86 {"item": "RLR-0X", "missing_field": "...", "source_id": "..."}87 ],88 "action_register": [89 {"action": "...", "owner": "...", "linked_item": "RLR-0X"}90 ],91 "readiness_decision": "ready_to_issue|ready_with_carried_actions|not_ready_to_issue",92 "claim_boundary_statement": "..."93}94```95 96Rules for the structured block:97 98- `computed_evidence` values must come from your own recomputation from packet source values. Omit a key only when its inputs are missing from the packet, then raise the matching information request instead.99- Every `fail` needs at least one finding with a non-empty `source_id`, `object_id`, `consequence`, and `action`.100- Every `insufficient_data` needs an information request naming the exact missing field and its source document.101- Carried actions must appear in `action_register` with an owner.102- `readiness_decision` must reconcile with your matrix.103- `claim_boundary_statement` must state that this review covers a task-owned synthetic source packet and does not claim authority approval, accepted project evidence, full standards compliance, source-pack hardening, executable-verifier readiness, or benchmark readiness.104 Each generated task is drawn from one of these realistic scenario bands.
Site contexts ground each scenario in a real locale the model can use to infer hidden values.
mainline_highway
Mainline rail crossing on a highway approach
urban_branch
Urban branch-line crossing with tighter equipment cabinet constraints
mainline-highway-crossing-mainline-highway-preview — hard difficulty, some inputs hidden.
Mainline rail crossing on a highway approach. mainline-highway-crossing. Required outputs: rlr_01_status, rlr_02_status, rlr_03_status, rlr_04_status, rlr_05_status, rlr_06_status
Scenario context and visible inputs.
Executable tool: level-crossing-warning-issue-review-package_calc.py
Inputs withheld at this difficulty.
Packet variant
packet_variant
Selected ups rating margin va
selected_ups_rating_margin_va
Battery runtime margin h
battery_runtime_margin_h
Voltage drop margin target
voltage_drop_margin_target_percent
Warning time deficit s
warning_time_deficit_s
Warning time margin s
warning_time_margin_s
The scored JSON answer schema.
{
"rlr_01_status": <number>,
"rlr_02_status": <number>,
"rlr_03_status": <number>,
"rlr_04_status": <number>,
"rlr_05_status": <number>,
"rlr_06_status": <number>,
"rlr_07_status": <number>,
"rlr_08_status": <number>,
"rlr_09_status": <number>,
"readiness_code": <number>,
"required_findings_count": <number>,
"required_information_requests_count": <number>,
"required_carried_actions_count": <number>,
"maximum_train_speed_m_s": <number>,
"provided_warning_time_s": <number>,
"strike_in_distance_m": <number>,
"warning_time_margin_s": <number>,
"gate_horizontal_margin_s": <number>,
"design_signal_load_w": <number>,
"required_battery_capacity_ah": <number>,
"installed_battery_capacity_ah": <number>,
"battery_runtime_h": <number>,
"battery_runtime_margin_h": <number>,
"dc_voltage_drop_margin_percent": <number>,
"fiber_link_margin_db": <number>
}